Home   >>   Departments   >>   Engineering   >>   Housing Building   >>   Swimming Pools


Building Project

Baby Swimming Pool - Lalbaugh

Sr No. Name Of Project Baby swimming pool
1 Location Lalbaugh
2 Year of construction 2016
3 Cost 0.25 Crore
4 Details of Construction Promotion of sports and conducting tournaments for swimming for children can be conducted.facility of Baby Swimming pool is provided having Individual changing Room for Boys & Girls & Provision of water filtration room.
5 Name of Contractor M/s Riddhi siddhi construction
6 Name of TPI Certifications Engineers India Limited.

Baby Swimming Pool - Sama Sports Complex

Sr No. Name Of Project Baby Swimming pool
1 Location Sama Sports Complex
2 Year of construction 2018
3 Cost 0.46 Crore
4 Details of Construction This pool ensures Swimming facility for adolescents from age 5 to 12 at various periods of the day with approx.10-15 children in a single batch. The size for this pool is 12mt length x 8mt of wide with tapering depth from 600mm to 750mm with minimum 1.5m walkway.In addition, the pool is filtered regularly by High-end Filtration plant installed on site to benefit the health of little swimmers.Morever Conveniences for Shower, Changing room along with locker facilities separately for boys and girls has been accommodated on site.Beautiful landscaping and area lighting is provided. As a part of Site Development Paver block is provided to maintain the high standards of cleanliness.
5 Name of Contractor M/s K.M.Odedara
6 Name of Project Management Consultant M/s L.J. Purani & Associates
7 Name of TPI Certifications Engineers India Limited.
Top